The City of Abbotsford is installing two test pumping wells in Matsqui Prairie, each to be pumped steadily for about 10 days, to learn whether vertical wells there can reliably meet Abbotsford and Mission’s long-term water needs.
The Province’s 2026 drought ratings for all 41 BC basins in one place, with a dated line each week they change, and the water scarcity pilot beside them.
The Regional District of Central Kootenay has hired Western Water Associates to assess how a deeper bedrock aquifer connects to surface water in the Goat River watershed near Creston, where allocation notations already sit on several streams and two shallow aquifers.